1 tskp bloomfield bloomfield high school exterior detail night shot outside of library 1400 0x0x1200x844 q85
2 tskp bloomfield bloomfield high school exterior detail sunrise outside of entrance 1400 0x154x1200x664 q85
3 tskp bloomfield bloomfield high school exterior detail sunrise outside of main entrance 1400 0x0x1200x903 q85
Slide4 main 1400 0x0x690x435 q85
5 tskp bloomfield bloomfield high school interior detail library 1400 0x0x1200x798 q85
6 tskp bloomfield bloomfield high school interior detail library quiet study area 1400 0x72x1200x829 q85
Slide7 main 1400 0x0x579x435 q85
8 tskp bloomfield bloomfield high school interior detail music performing room 2 1400 0x54x1200x847 q85

TSKP STUDIO programmed and designed a phased expansion / renovation of the 178,000 sq. ft. facility allowing for continuous occupancy. In order to maximize the budget, the building received varying levels of renovations, along with partial roof replacement and 12,504 sq. ft. of new construction. Our team developed the plan for phased renovations over a two-year span, which eliminated the need and expense of portables. The new construction consists of four small additions; a library/media center addition featuring the central courtyard (now the heart of the school), a stage and music room addition adjacent to the existing auditorium, and two reconfigured entrances. The project provided both badly needed upgrades to lighting, HVAC systems and finishes throughout, as well as improvements to the site, entry systems and overall image.

Client

Town of Bloomfield

Location

Bloomfield, CT

Size

178,000 sq. ft.

Arrow pink Arrow white
Arrow pink Arrow white

Bloomfield High School

1 tskp bloomfield bloomfield high school exterior detail night shot outside of library 1400 xxx q85
2 tskp bloomfield bloomfield high school exterior detail sunrise outside of entrance 1400 xxx q85
3 tskp bloomfield bloomfield high school exterior detail sunrise outside of main entrance 1400 xxx q85
Slide4 main 1400 xxx q85
5 tskp bloomfield bloomfield high school interior detail library 1400 xxx q85
6 tskp bloomfield bloomfield high school interior detail library quiet study area 1400 xxx q85
Slide7 main 1400 xxx q85
8 tskp bloomfield bloomfield high school interior detail music performing room 2 1400 xxx q85
Arrow pink
Arrow pink

Bloomfield High School

TSKP STUDIO programmed and designed a phased expansion / renovation of the 178,000 sq. ft. facility allowing for continuous occupancy. In order to maximize the budget, the building received varying levels of renovations, along with partial roof replacement and 12,504 sq. ft. of new construction. Our team developed the plan for phased renovations over a two-year span, which eliminated the need and expense of portables. The new construction consists of four small additions; a library/media center addition featuring the central courtyard (now the heart of the school), a stage and music room addition adjacent to the existing auditorium, and two reconfigured entrances. The project provided both badly needed upgrades to lighting, HVAC systems and finishes throughout, as well as improvements to the site, entry systems and overall image.

Client

Town of Bloomfield

Location

Bloomfield, CT

Size

178,000 sq. ft.