Project Update – October 2011

October 2011 – The TSKP design team has begun to document existing conditions on the site which will drive the development of the concept. You may remember that a preliminary plan was developed prior to local authorization allowing the Town to apply for a Connecticut School Construction Grant with the Connecticut Department of Education. The grant application also known as the ED049 was submitted this past June 2011. That document can be found under the Documents tab above. TSKP is basing its work on a refined version of the pre-referendum concept, focusing on improving site circulation for both the Stratford Academy and the new Honeyspot.